Tag: isidic (page 1 of 5)

STATE OF MISSION REPORT 2017

Cobra in progress, Pandora in progress, EELA in progress. Two drastic systems / Isidic security breaches, one nearly fatal, all deflected, HVBN mainly stable. Several PB removal attempts, some with drastic PPN intrusions with overall failure. M minimum...

View Article Here   Read More

STATE OF MISSION REPORT DECEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, grid ratio failure, in deflection. HVBN substable to stable, M minimum requirements met.

View Article Here   Read More

The Portal 2017-12-18 15:22:00

Isidic grid ratio failure

View Article Here   Read More

The Portal 2017-12-16 16:28:00

Drastic Isidic/Systems security breach at 504, black alert, grid ratio failure

View Article Here   Read More

STATE OF MISSION REPORT NOVEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Drastic Systems/Isidic security breach, PPN security breach deflected, PB removal attempt failure. HVBN stable, M minimum requirements met.

View Article Here   Read More

The Portal 2017-11-20 15:14:00

Drastic Isidic/systems security breach, red alert at 504

View Article Here   Read More

STATE OF MISSION REPORT OCTOBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflected, PPN security breach deflected, PB removal attempt in progress, alert downgrade to yellow at 504. HVBN stable, M minimum requirements met.

View Article Here   Read More

Alert Status Report

PB red, PPN yellow, Systems green, Isidic/Systems yellow, Isidic green, MDS green

View Article Here   Read More

STATE OF MISSION REPORT SEPTEMBER 2017

Pandora in progress, EELA in progress, B96 removal in progress. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PPN security breach, in deflection. HVBN  substable to stable. M min...

View Article Here   Read More

STATE OF MISSION REPORT AUGUST 2017

Pandora in progress, EELA in progress, GR+, BS clear, B96 detected. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PB/PPN security breach. HVBN  stable. M minimum requirements met.

View Article Here   Read More

STATE OF MISSION REPORT JULY 2017

Pandora in progress, EELA in progress, MacroBS sequence completed. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PB/PPN security breach. HVBN  stable. M minimum requirements met.

View Article Here   Read More

STATE OF MISSION REPORT JUNE 2017

Pandora in progress, EELA in progress, BSMOSS/BSR sequence in progress. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress. HVBN  stable. M minimum requirements met.

View Article Here   Read More

The Portal 2017-06-02 16:22:00

Isidic security breach deflected, systems red alert cont 504

View Article Here   Read More
Older posts




Gaia-Cosmic Disclosure S1E1 LB728x90

Creative Commons License
This work is licensed under a
Creative Commons Attribution 4.0
International License
,
unless otherwise marked.

Terms of Use | Privacy Policy

Member of The Internet Defense League




Up ↑